Guinea
Well Installation
Guinea Current Update
In Guinea, the bore hole for the well installation in Ditinn has been dug and villagers now have access to fresh water. The first drilling rig broke down and instead of delaying the construction process, the Wings of Hope civil engineer supervisor on site worked with the local community and with another drilling rig completed the well installation on schedule. More needs to be done to establish a water distribution center for the local villagers but at present, there is joy and hope for a better future from the Ditinn community in Guinea.
The bore hole for the well installation in Ditinn.
Fresh ground water brought to Ditinn Villagers.
Improving Environmental Sustainability
Access to Sanitary Drinking Water
Parasites in surface water and waterborne diseases have caused great suffering to impoverished people. Drilling for fresh water and making it easily accessible has been health giving to people in need and has eased the burden on those who have had to carry it home from distant water sources.
The Wings of Hope Global Cooperative is pleased to partner with N’Mah Keita and her daughter Aicha’s “Wells of Hope Africa,” to provide the resources to support a water well installation in Mangata and also to other localities in need of healthy fresh water in Guinea. In addition to these water related projects, the construction of a medical clinic is planned.
Project Overview
N’Mah Keita and her daughter Aicha founded Wells of Hope in 2020 with the installation of a village well in Guinea. N’Mah Keita has joined the Wings of Hope Global Cooperative Board and with her daughter will continue to promote the Wells of Hope mission to provide healthy water to other villages in Guinea. The Wings of Hope Global Cooperative is fortunate to have the civil engineer and project management experience of Yaya Doukoure as the on-site project manager and will work with local Guinean contractors on well installations that will range in cost between $5000.00 and $10,000.00.
Water Well Installation | Total: $5,988.00
Water Distribution Station | Total: $3,000.00
